San Pasqual Band of Mission Indians, Reclaimed Water (Districts A and B)

Created (4.2 Miles) of as-built plans and Reclaimed Water (engineering drawings) by assessing existing utility as-builts, collect drone data, LiDAR, and GPR.

Project Description:

Created (4.2 Miles) of as-built plans and Reclaimed Water (engineering drawings) by assessing existing utility as-builts, collect drone data, LiDAR, and GPR.

Deliverable:

CAD Base Maps, ‘As-Built’ PDF and Engineering drawings, including plan and profile. Provided construction field engineering support.