City of Colton Wastewater Plant, ‘Facility As-Built’

Created a facility master ‘as-built’ base map ahead of a major renovation and expansion project. Reviewed and digitized existing as-builts, used a drone for aerial mapping, LiDAR, and GPR.

Project Description:

Created a facility master ‘as-built’ base map ahead of a major renovation and expansion project. Reviewed and digitized existing as-builts, used a drone for aerial mapping, LiDAR, and GPR.

Deliverable:

CAD Base Maps, ‘As-Built’ PDF drawings, infrastructure 3D modeling, and an Augmented Reality (AR) deliverable.